Table 3

Costs and quality-adjusted life years (QALYs) of bike lane construction in 2015 versus status quo

Point estimate95% CI
Costs, status quo31.28(7.04 to 65.05)
Costs, bike lanes34.07(9.61 to 67.78)
Incremental costs2.79(−1.11 to 6.57)
QALYs, status quo31.076(24.8878 to 32.4646)
QALYs, bike lanes31.0782(24.8898 to 32.4673)
Incremental QALYs0.0022(0.0008 to 0.0038)
ICER1296.5(−544.08 to 5037.89)
  • ICER, incremental cost-effectiveness ratio.